1 to 5,
3
3000
2000 X 50 & 3500 X 50mm
8, 10, 14 & 16 Inches
0.09 to 30 KW
415 V, 380 V, 220 V or as per requirement
50 Hz/ 60 Hz or as per requirement
S1
TEFC
50°C
Class ‘B’ (80ºC)
SKF Double Sealed Ball Bearings
1 to 1.15
Cast Iron

Got questions or need assistance with your Industry needs?
The primary goals of the Total Quality Management (TQM) project are to enhance product quality, reduce defects, and foster a culture of continuous improvement.
The project addresses inconsistencies in product quality, inefficiencies in production processes.
The project implements Total Quality Management solutions to improve product quality.
We implement rigorous quality control measures at every stage of production, ensuring consistency and high standards.
We implement rigorous quality control measures at every stage of production, ensuring consistency and high standards.
We implement rigorous quality control measures at every stage of production, ensuring consistency and high standards.
We implement rigorous quality control measures at every stage of production, ensuring consistency and high standards.
We implement rigorous quality control measures at every stage of production, ensuring consistency and high standards.
Join us to experience cutting-edge industrial solutions that drive innovation, lasting success.
We are in electrical field since 1938. In beginning stage we were attending work of electric fittings and we started our retail shop in 1984. Second shop was started in 1967 and after 6 years, i.e. in the year of 1973 we established factory of manufacturing just 5 motors per month, which is now 1200 motors per month.
Copyright © 2025 AMBER Engineering Enterprise. All Rights Reserved. Developed & Maintained by The Pioneer Tech.
